<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>AG Group</title>
	<atom:link href="https://aggroup.com.mt/feed/" rel="self" type="application/rss+xml" />
	<link>https://aggroup.com.mt/</link>
	<description>State of the art electrical &#38; mechanical design.</description>
	<lastBuildDate>Tue, 23 Jun 2026 13:31:13 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://aggroup.com.mt/wp-content/uploads/2020/08/cropped-favicon-1-32x32.png</url>
	<title>AG Group</title>
	<link>https://aggroup.com.mt/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>AG wins multiple awards at the Local Business Awards 2026</title>
		<link>https://aggroup.com.mt/ag-wins-multiple-awards-at-the-local-business-awards-2026/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=ag-wins-multiple-awards-at-the-local-business-awards-2026</link>
					<comments>https://aggroup.com.mt/ag-wins-multiple-awards-at-the-local-business-awards-2026/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Thu, 18 Jun 2026 16:09:28 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3134</guid>

					<description><![CDATA[<p>AG Group is proud to announce its outstanding success at the Local Business Awards 2026, organised by Dynamic Events and held on 14th May 2026 at Xara Lodge, Rabat. The company was honoured with four prestigious industry awards, further reinforcing its position as a leader in the power and energy sector. These achievements reflect AG [&#8230;]</p>
<p>The post <a href="https://aggroup.com.mt/ag-wins-multiple-awards-at-the-local-business-awards-2026/">AG wins multiple awards at the Local Business Awards 2026</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>AG Group is proud to announce its outstanding success at the Local Business Awards 2026, organised by Dynamic Events and held on 14th May 2026 at Xara Lodge, Rabat. </p>



<p>The company was honoured with four prestigious industry awards, further reinforcing its position as a leader in the power and energy sector. </p>



<ul class="wp-block-list">
<li>International High &amp; Medium Voltage Contractor of the Year</li>



<li>Engineering, Procurement, and Construction (EPC) Excellence in Power Transmission &amp; Distribution</li>



<li>SCADA &amp; Auxiliary Systems Integration Contractor Award</li>



<li>High &amp; Medium Voltage Grid Infrastructure Contractor Award</li>
</ul>



<p>These achievements reflect AG Group’s commitment to quality, innovation, and excellence in every project it undertakes.</p>



<figure class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="1024" height="681" data-id="3140" src="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1142-1024x681.webp" alt="" class="wp-image-3140" srcset="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1142-1024x681.webp 1024w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1142-300x200.webp 300w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1142-768x511.webp 768w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1142.webp 1209w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="681" data-id="3139" src="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1141-1024x681.webp" alt="" class="wp-image-3139" srcset="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1141-1024x681.webp 1024w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1141-300x200.webp 300w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1141-768x511.webp 768w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1141.webp 1209w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="681" data-id="3138" src="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1131-1024x681.webp" alt="" class="wp-image-3138" srcset="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1131-1024x681.webp 1024w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1131-300x200.webp 300w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1131-768x511.webp 768w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1131.webp 1209w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="681" data-id="3137" src="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1129-1024x681.webp" alt="" class="wp-image-3137" srcset="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1129-1024x681.webp 1024w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1129-300x200.webp 300w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1129-768x511.webp 768w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1129.webp 1209w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="681" data-id="3136" src="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1073-1024x681.webp" alt="" class="wp-image-3136" srcset="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1073-1024x681.webp 1024w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1073-300x200.webp 300w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1073-768x511.webp 768w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1073.webp 1209w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="681" data-id="3135" src="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1047-1024x681.webp" alt="" class="wp-image-3135" srcset="https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1047-1024x681.webp 1024w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1047-300x200.webp 300w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1047-768x511.webp 768w, https://aggroup.com.mt/wp-content/uploads/2026/06/LOR_1047.webp 1209w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>
</figure>
<p>The post <a href="https://aggroup.com.mt/ag-wins-multiple-awards-at-the-local-business-awards-2026/">AG wins multiple awards at the Local Business Awards 2026</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/ag-wins-multiple-awards-at-the-local-business-awards-2026/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Another milestone for the second Malta–Sicily interconnector project</title>
		<link>https://aggroup.com.mt/milestone-for-maltas-second-interconnector/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=milestone-for-maltas-second-interconnector</link>
					<comments>https://aggroup.com.mt/milestone-for-maltas-second-interconnector/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Thu, 28 May 2026 17:08:00 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3168</guid>

					<description><![CDATA[<p>Another milestone for the second Malta–Sicily interconnector project Testing of key 220kV electrical equipment in Türkiye has been completed successfully. The equipment is now being prepared for transport to Malta and Sicily. This project will double Malta’s interconnection capacity and further strengthen security of supply.</p>
<p>The post <a href="https://aggroup.com.mt/milestone-for-maltas-second-interconnector/">Another milestone for the second Malta–Sicily interconnector project</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Another milestone for the second Malta–Sicily interconnector project <img loading="lazy" decoding="async" height="16" width="16" alt="🇲🇹" src="https://static.xx.fbcdn.net/images/emoji.php/v9/t4/2/16/1f1f2_1f1f9.png"><img loading="lazy" decoding="async" height="16" width="16" alt="🇮🇹" src="https://static.xx.fbcdn.net/images/emoji.php/v9/t18/2/16/1f1ee_1f1f9.png"></p>



<p>Testing of key 220kV electrical equipment in Türkiye has been completed successfully. The equipment is now being prepared for transport to Malta and Sicily.</p>



<p>This project will double Malta’s interconnection capacity and further strengthen security of supply.</p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://icm.mt/manufacturing-of-key-equipment-for-the-second-interconnector-completed/" target="_blank" rel="noreferrer noopener">Read More</a></div>
</div>



<p></p>
<p>The post <a href="https://aggroup.com.mt/milestone-for-maltas-second-interconnector/">Another milestone for the second Malta–Sicily interconnector project</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/milestone-for-maltas-second-interconnector/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>New 30MVA Transformers Arrive at Naxxar Distribution Centre</title>
		<link>https://aggroup.com.mt/new-30mva-transformers-arrive-at-naxxar-distribution-centre/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=new-30mva-transformers-arrive-at-naxxar-distribution-centre</link>
					<comments>https://aggroup.com.mt/new-30mva-transformers-arrive-at-naxxar-distribution-centre/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Fri, 08 May 2026 17:16:00 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3173</guid>

					<description><![CDATA[<p>New 30MVA transformers have arrived in Naxxar, and installation is already underway. This marks a significant milestone for the distribution centre and the continued expansion of our network Powering a stronger network for tomorrow.</p>
<p>The post <a href="https://aggroup.com.mt/new-30mva-transformers-arrive-at-naxxar-distribution-centre/">New 30MVA Transformers Arrive at Naxxar Distribution Centre</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>New 30MVA transformers have arrived in Naxxar, and installation is already underway.</p>



<p>This marks a significant milestone for the distribution centre and the continued expansion of our network</p>



<iframe loading="lazy" src="https://www.facebook.com/plugins/video.php?height=314&#038;href=https%3A%2F%2Fwww.facebook.com%2Freel%2F1014347721270561%2F&#038;show_text=false&#038;width=640&#038;t=0" width="100%" height="420" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share" allowFullScreen="true"></iframe>



<p><strong>Powering a stronger network for tomorrow.</strong></p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://www.facebook.com/reel/1014347721270561" target="_blank" rel="noreferrer noopener">Read More</a></div>
</div>



<p></p>
<p>The post <a href="https://aggroup.com.mt/new-30mva-transformers-arrive-at-naxxar-distribution-centre/">New 30MVA Transformers Arrive at Naxxar Distribution Centre</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/new-30mva-transformers-arrive-at-naxxar-distribution-centre/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>New Milestone for Malta’s Second Interconnector (IC2)!</title>
		<link>https://aggroup.com.mt/new-milestone-for-maltas-second-interconnector-ic2/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=new-milestone-for-maltas-second-interconnector-ic2</link>
					<comments>https://aggroup.com.mt/new-milestone-for-maltas-second-interconnector-ic2/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Sat, 28 Mar 2026 18:03:00 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3164</guid>

					<description><![CDATA[<p>Works have officially started in Ragusa to install a new hybrid switchgear—another step forward for the IC2 project. To safely reroute existing IC1 cables, the first interconnector will undergo a planned 3‑day shutdown, coordinated between Interconnect Malta, Enemalta, Terna Energy Solutions, and the Italian Transmission System Operator. Local generation at Delimara will fully support Malta’s [&#8230;]</p>
<p>The post <a href="https://aggroup.com.mt/new-milestone-for-maltas-second-interconnector-ic2/">New Milestone for Malta’s Second Interconnector (IC2)!</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Works have officially started in Ragusa to install a new hybrid switchgear—another step forward for the IC2 project.</p>



<p>To safely reroute existing IC1 cables, the first interconnector will undergo a planned 3‑day shutdown, coordinated between Interconnect Malta, Enemalta, Terna Energy Solutions, and the Italian Transmission System Operator.</p>



<p><img loading="lazy" decoding="async" height="16" width="16" alt="✅" src="https://static.xx.fbcdn.net/images/emoji.php/v9/tb4/2/16/2705.png"> Local generation at Delimara will fully support Malta’s electricity demand throughout this period.</p>



<p><img loading="lazy" decoding="async" height="16" width="16" alt="✅" src="https://static.xx.fbcdn.net/images/emoji.php/v9/tb4/2/16/2705.png"> Additional civil works will also prepare a new fire‑protection system for the site.</p>



<p><img loading="lazy" decoding="async" height="16" width="16" alt="✅" src="https://static.xx.fbcdn.net/images/emoji.php/v9/tb4/2/16/2705.png"> Rerouting will be carried out jointly with our colleagues at Enemalta and Terna Energy Solutions</p>



<p>Malta is strengthening its energy future—safely, strategically, and sustainably. <img loading="lazy" decoding="async" height="16" width="16" alt="🌱" src="https://static.xx.fbcdn.net/images/emoji.php/v9/t8/2/16/1f331.png"><img loading="lazy" decoding="async" height="16" width="16" alt="⚡" src="https://static.xx.fbcdn.net/images/emoji.php/v9/tde/2/16/26a1.png"></p>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://www.facebook.com/story.php?story_fbid=1381897247312368&amp;id=100064763170325&amp;mibextid=wwXIfr&amp;rdid=kdAnwRxgMpNdk8id#" target="_blank" rel="noreferrer noopener">Read More</a></div>
</div>
<p>The post <a href="https://aggroup.com.mt/new-milestone-for-maltas-second-interconnector-ic2/">New Milestone for Malta’s Second Interconnector (IC2)!</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/new-milestone-for-maltas-second-interconnector-ic2/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Installation of Switchgear at Naxxar Distribution Centre</title>
		<link>https://aggroup.com.mt/installation-of-switchgear-at-naxxar-distribution-centre/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=installation-of-switchgear-at-naxxar-distribution-centre</link>
					<comments>https://aggroup.com.mt/installation-of-switchgear-at-naxxar-distribution-centre/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Wed, 04 Mar 2026 09:35:00 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3160</guid>

					<description><![CDATA[<p>Installation of the switchgear has begun at the new Distribution Centre in Naxxar. Building a stronger electricity network. Building a stronger electricity network.</p>
<p>The post <a href="https://aggroup.com.mt/installation-of-switchgear-at-naxxar-distribution-centre/">Installation of Switchgear at Naxxar Distribution Centre</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Installation of the switchgear has begun at the new Distribution Centre in Naxxar. Building a stronger electricity network.</p>



<iframe loading="lazy" src="https://www.facebook.com/plugins/video.php?height=314&#038;href=https%3A%2F%2Fwww.facebook.com%2Freel%2F26298564166499893%2F&#038;show_text=false&#038;width=640&#038;t=0" width="100%" height="420" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share" allowFullScreen="true"></iframe>



<p><strong>Building a stronger electricity network.</strong></p>



<div class="wp-block-buttons is-content-justification-left is-layout-flex wp-container-core-buttons-is-layout-fdcfc74e wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link has-text-align-left wp-element-button" href="https://www.facebook.com/story.php?story_fbid=1394403369396957&amp;id=100064819205417&amp;mibextid=wwXIfr&amp;rdid=7loOhkcYSTZdRXyc#" target="_blank" rel="noreferrer noopener">Read More</a></div>
</div>



<p></p>
<p>The post <a href="https://aggroup.com.mt/installation-of-switchgear-at-naxxar-distribution-centre/">Installation of Switchgear at Naxxar Distribution Centre</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/installation-of-switchgear-at-naxxar-distribution-centre/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Manufacturing Begins for Malta–Sicily Second Interconnector</title>
		<link>https://aggroup.com.mt/manufacturing-begins-for-malta-sicily-second-interconnector/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=manufacturing-begins-for-malta-sicily-second-interconnector</link>
					<comments>https://aggroup.com.mt/manufacturing-begins-for-malta-sicily-second-interconnector/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Sat, 21 Feb 2026 09:23:00 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3150</guid>

					<description><![CDATA[<p>MANUFACTURING BEGINS ON STRATEGIC INFRASTRUCTURE FOR THE SECOND ELECTRICITY INTERCONNECTOR BETWEEN MALTA AND SICILY Production has commenced on key equipment for the project, including a 245kV autotransformer with a capacity of 250MVA, as well as 120MVAr and 240MVAr variable shunt reactors. This equipment is essential for ensuring effective voltage control and maintaining the stability of [&#8230;]</p>
<p>The post <a href="https://aggroup.com.mt/manufacturing-begins-for-malta-sicily-second-interconnector/">Manufacturing Begins for Malta–Sicily Second Interconnector</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>MANUFACTURING BEGINS ON STRATEGIC INFRASTRUCTURE FOR THE SECOND ELECTRICITY INTERCONNECTOR BETWEEN MALTA AND SICILY</strong></p>



<p>Production has commenced on key equipment for the project, including a 245kV autotransformer with a capacity of 250MVA, as well as 120MVAr and 240MVAr variable shunt reactors. This equipment is essential for ensuring effective voltage control and maintaining the stability of the interconnection. Manufacturing has started at the specialized facilities of BEST in Türkiye, in line with the agreed project schedule.</p>



<iframe loading="lazy" src="https://www.facebook.com/plugins/video.php?height=314&#038;href=https%3A%2F%2Fwww.facebook.com%2Freel%2F1450111886790032%2F&#038;show_text=false&#038;width=640&#038;t=0" width="100%" height="420" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share" allowFullScreen="true"></iframe>



<p>The €20.2 million contract is being executed by Maltese contractor <strong>AG Installations</strong>, in close collaboration with its international technical partner, <strong>BEST</strong>.</p>



<p>The project is co-financed by the European Union through the <strong>European Regional Development Fund (ERDF)</strong> and contributes directly to a more resilient, efficient, and sustainable energy system.</p>



<div class="wp-block-buttons is-content-justification-left is-layout-flex wp-container-core-buttons-is-layout-fdcfc74e wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link has-text-align-left wp-element-button" href="https://www.facebook.com/reel/1450111886790032" target="_blank" rel="noreferrer noopener">Read More</a></div>
</div>
<p>The post <a href="https://aggroup.com.mt/manufacturing-begins-for-malta-sicily-second-interconnector/">Manufacturing Begins for Malta–Sicily Second Interconnector</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/manufacturing-begins-for-malta-sicily-second-interconnector/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Malta–Sicily Interconnector project well underway</title>
		<link>https://aggroup.com.mt/malta-sicily-interconnector-project-well-underway/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=malta-sicily-interconnector-project-well-underway</link>
					<comments>https://aggroup.com.mt/malta-sicily-interconnector-project-well-underway/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Mon, 29 Sep 2025 18:33:19 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3076</guid>

					<description><![CDATA[<p>Following the official award of the €20 million Malta–Sicily Interconnector project, AG Group immediately mobilised its teams. Progress is well underway, with strict adherence to milestones and timelines already being met. This project plays a vital role in strengthening regional energy transmission and grid reliability, ensuring long-term energy stability between Malta and Sicily. Our engineering [&#8230;]</p>
<p>The post <a href="https://aggroup.com.mt/malta-sicily-interconnector-project-well-underway/">Malta–Sicily Interconnector project well underway</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Following the official award of the <strong>€20 million Malta–Sicily Interconnector project</strong>, <strong>AG Group</strong> immediately mobilised its teams. Progress is well underway, with strict adherence to milestones and timelines already being met.</p>



<p>This project plays a vital role in strengthening <strong>regional energy transmission and grid reliability</strong>, ensuring long-term energy stability between Malta and Sicily.</p>



<div class="iframe-container long"><iframe loading="lazy" src="https://www.facebook.com/plugins/video.php?height=476&#038;href=https%3A%2F%2Fwww.facebook.com%2Fmaltadaily.mt%2Fvideos%2F792869746667688%2F&#038;show_text=false&#038;width=267&#038;t=0" width="267" height="476" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share" allowFullScreen="true"></iframe></div>



<p><strong>Our engineering scope includes:</strong></p>



<ul class="wp-block-list">
<li>Installation of <strong>shunt reactors</strong> in <strong>Magħtab (Malta)</strong> and <strong>Ragusa (Sicily)</strong> to manage reactive power and boost transmission efficiency</li>



<li>Deployment of a <strong>220kV/132kV transformer in Magħtab</strong> to step down voltage levels and seamlessly integrate the interconnector with Malta&#8217;s distribution grid</li>
</ul>



<div class="iframe-container long"><iframe loading="lazy" src="https://www.facebook.com/plugins/video.php?height=476&#038;href=https%3A%2F%2Fwww.facebook.com%2Freel%2F1138482647669085%2F&#038;show_text=false&#038;width=267&#038;t=0" width="267" height="476" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share" allowFullScreen="true"></iframe></div>



<p>This contract further reinforces <strong>AG Group’s position as a trusted provider of high-voltage engineering solutions</strong> for vital energy infrastructure.</p>



<div class="iframe-container square"><iframe loading="lazy" src="https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2Fstefanzrinzo%2Fposts%2Fpfbid0grR87Lxi4QjHuspDnxhPrVjh5aCYQu6FaNTnPLYZSUsfvkZpknh6LPUywaw6Bfzml&#038;show_text=true&#038;width=500" width="500" height="773" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share"></iframe></div>



<p><strong><em>Photo: <a href="https://www.facebook.com/stefanzrinzo">https://www.facebook.com/stefanzrinzo</a></em></strong></p>
<p>The post <a href="https://aggroup.com.mt/malta-sicily-interconnector-project-well-underway/">Malta–Sicily Interconnector project well underway</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/malta-sicily-interconnector-project-well-underway/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Works underway on a new electricity distribution centre in Siġġiewi</title>
		<link>https://aggroup.com.mt/works-underway-on-a-new-electricity-distribution-centre-in-siggiewi/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=works-underway-on-a-new-electricity-distribution-centre-in-siggiewi</link>
					<comments>https://aggroup.com.mt/works-underway-on-a-new-electricity-distribution-centre-in-siggiewi/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Mon, 29 Sep 2025 18:20:10 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3066</guid>

					<description><![CDATA[<p>Works are progressing in Siġġiewi, where AG Group is executing the €9+ million turnkey development of a 33kV/11kV gas-insulated distribution centre — part of Enemalta&#8217;s nationwide initiative to boost grid capacity and reliability. As the local MEP contractor, AG Group is leveraging its in-house expertise and dedicated design team to deliver a full design-and-build solution [&#8230;]</p>
<p>The post <a href="https://aggroup.com.mt/works-underway-on-a-new-electricity-distribution-centre-in-siggiewi/">Works underway on a new electricity distribution centre in Siġġiewi</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Works are progressing in <strong>Siġġiewi</strong>, where <strong>AG Group</strong> is executing the €9+ million turnkey development of a <strong>33kV/11kV gas-insulated distribution centre</strong> — part of Enemalta&#8217;s nationwide initiative to boost grid capacity and reliability.</p>



<p>As the local MEP contractor, AG Group is leveraging its in-house expertise and dedicated design team to deliver a full <strong>design-and-build solution</strong> for the medium voltage systems, supported by its trusted partners and technology providers.</p>



<div class="iframe-container"><iframe loading="lazy" src="https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2FTheMaltaIndependent%2Fposts%2Fpfbid0gE3qdrdkutxWT8LHQS3ZNfqXNibUp2NK2YJx6d2i1Ru2fWRpfR7CZJSP2dDXEvLHl&#038;show_text=true&#038;width=500" width="500" height="654" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share"></iframe></div>



<p><strong>Scope of works includes:</strong></p>



<ul class="wp-block-list">
<li>Civil construction, MEP systems, and architectural finishing</li>



<li>GIS switchgear, power transformers, and SCADA systems</li>



<li>Protection, control, MV/LV, signalling, and fibre cabling</li>



<li>External works and landscaping</li>
</ul>



<p>A fully integrated <strong>EPC project</strong> — designed, managed, and powered by AG.</p>



<div class="iframe-container"><iframe loading="lazy" src="https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2Ftimesofmalta%2Fposts%2Fpfbid0gGLrg7V2Qe44z1k69PSKcVYL3gCq8GFJVpDkim6MQatdMFoVA53ETks8mkAgKrjvl&#038;show_text=true&#038;width=500" width="500" height="654" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share"></iframe></div>



<p><strong><em>Photo: MEEC/MFI (Times of Malta)</em></strong></p>
<p>The post <a href="https://aggroup.com.mt/works-underway-on-a-new-electricity-distribution-centre-in-siggiewi/">Works underway on a new electricity distribution centre in Siġġiewi</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/works-underway-on-a-new-electricity-distribution-centre-in-siggiewi/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Fgura District Park Project</title>
		<link>https://aggroup.com.mt/fgura-district-park-project/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=fgura-district-park-project</link>
					<comments>https://aggroup.com.mt/fgura-district-park-project/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Mon, 29 Sep 2025 09:49:37 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3040</guid>

					<description><![CDATA[<p>AG Group is proud to lead the Fgura District Park Project — a transformative urban regeneration initiative set to deliver a modern, inclusive, and sustainable green space for the community. With the support of specialist contractors, AG Group is delivering the full project scope — from excavation and infrastructure to finishes and long-term maintenance — [&#8230;]</p>
<p>The post <a href="https://aggroup.com.mt/fgura-district-park-project/">Fgura District Park Project</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>AG Group is proud to lead the Fgura District Park Project — a transformative urban regeneration initiative set to deliver a modern, inclusive, and sustainable green space for the community.</p>



<div class="iframe-container"><iframe loading="lazy" src="https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2Fprojectgreenmt%2Fposts%2Fpfbid0sThuPwVrexm1zPgMw3jKuGwyVNaaXAHHR1GYrud5pwisNv81crX7HGCWbFPJPTDml&#038;show_text=true&#038;width=500" width="500" height="442" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowfullscreen="true" allow="autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share"></iframe></div>



<p>With the support of specialist contractors, AG Group is delivering the full project scope — from excavation and infrastructure to finishes and long-term maintenance — while also taking the lead in the procurement of high-quality, environmentally conscious products and materials.</p>



<p>✔️ Specialised procurement of certified playground equipment, outdoor furniture, and finishes from leading international suppliers<br>✔️ Use of energy-efficient, UPVC and eco-friendly materials, chosen for durability, performance, and low environmental impact<br>✔️ Planting strategy guided by expert consultation — including on-site surveys to determine which existing species to preserve and which to replace, ensuring long-term biodiversity and balance</p>



<p>Our scope also includes:<br>▪️ Ground formation &amp; underground reservoirs<br>▪️ Full MEP systems, irrigation &amp; native landscaping<br>▪️ Construction of public amenities, football pitch &amp; accessible pathways<br>▪️ Installation of signage, street furniture &amp; children’s play areas<br>▪️ Multi-year maintenance strategy</p>



<p>A space for people, shaped by purpose — delivered with care, precision, and sustainability.</p>



<h2 class="wp-block-heading"><strong><em>One News Report</em></strong></h2>



<figure class="wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio"><div class="wp-block-embed__wrapper">
<iframe loading="lazy" title="JIBDA X-XOGĦOL FUQ IL-FGURA DISTRICT PARK" width="1170" height="658" src="https://www.youtube.com/embed/qbf8UMMfsoQ?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe>
</div></figure>



<div class="wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link wp-element-button" href="https://one.com.mt/jibda-l-progett-ta-e4-2-miljun-fil-fgura-district-park-ghal-50000-metru-kwadru-ohra-ta-spazju-miftuh-gdid/">Read Article</a></div>
</div>



<p><strong><em>Photo: Jason Borg / DOI / One News</em></strong></p>
<p>The post <a href="https://aggroup.com.mt/fgura-district-park-project/">Fgura District Park Project</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/fgura-district-park-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>‘We love taking on challenges that others haven’t before’</title>
		<link>https://aggroup.com.mt/we-love-taking-on-challenges-that-others-havent-before/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=we-love-taking-on-challenges-that-others-havent-before</link>
					<comments>https://aggroup.com.mt/we-love-taking-on-challenges-that-others-havent-before/#respond</comments>
		
		<dc:creator><![CDATA[AG GROUP]]></dc:creator>
		<pubDate>Tue, 12 Aug 2025 13:46:12 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://aggroup.com.mt/?p=3031</guid>

					<description><![CDATA[<p>The CEO reveals the story behind building AG Group from a one-man venture into an industry powerhouse, the philosophy that drives its success, and his vision for the future. From a single spark of entrepreneurial ambition to designing the future of a nation’s energy, Andrei Grech’s vision for AG Group is as clear as it [&#8230;]</p>
<p>The post <a href="https://aggroup.com.mt/we-love-taking-on-challenges-that-others-havent-before/">‘We love taking on challenges that others haven’t before’</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><em>The CEO reveals the story behind building AG Group from a one-man venture into an industry powerhouse, the philosophy that drives its success, and his vision for the future.</em></p>



<p>From a single spark of entrepreneurial ambition to designing the future of a nation’s energy, Andrei Grech’s vision for AG Group is as clear as it is powerful. Apart from engineering excellence, it is a vision built on a foundation of passion, agility, and the unwavering belief that to succeed, you have to be fast, sharp, and always ready for the next challenge.</p>



<p>Reflecting on the exciting journey which has seen him build AG Group into the diversified engineering powerhouse it is today, Andrei’s story reads like a masterclass in ambition, strategy, and relentless forward momentum.&nbsp;</p>


<div class="wp-block-image">
<figure class="aligncenter size-large"><img loading="lazy" decoding="async" width="1024" height="682" src="https://aggroup.com.mt/wp-content/uploads/2025/08/aggroup-1024x682.jpeg" alt="" class="wp-image-3032" srcset="https://aggroup.com.mt/wp-content/uploads/2025/08/aggroup-1024x682.jpeg 1024w, https://aggroup.com.mt/wp-content/uploads/2025/08/aggroup-300x200.jpeg 300w, https://aggroup.com.mt/wp-content/uploads/2025/08/aggroup-768x512.jpeg 768w, https://aggroup.com.mt/wp-content/uploads/2025/08/aggroup-1536x1023.jpeg 1536w, https://aggroup.com.mt/wp-content/uploads/2025/08/aggroup.jpeg 1600w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure></div>


<p>Established in 2005 as a small electrical installations firm, AG Group has undergone a remarkable transformation. Under the leadership of CEO and founder Andrei, the company has evolved from a traditional MEP contractor into an integrated engineering group with eight distinct business units, a hundred-strong workforce, and its own fleet of vehicles operating from its Qormi headquarters. Today, it enjoys pride of place at the forefront of Malta’s infrastructure development, shaping the very grid that powers the nation.&nbsp;</p>



<div class="wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex">
<div class="wp-block-button"><a class="wp-block-button__link has-text-align-center wp-element-button" href="https://whoswho.mt/en/we-love-taking-on-challenges-that-others-haven-t-before-andrei-grech" target="_blank" rel="noreferrer noopener">Read More</a></div>
</div>
<p>The post <a href="https://aggroup.com.mt/we-love-taking-on-challenges-that-others-havent-before/">‘We love taking on challenges that others haven’t before’</a> appeared first on <a href="https://aggroup.com.mt">AG Group</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://aggroup.com.mt/we-love-taking-on-challenges-that-others-havent-before/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
